GB 50500-2013 第9.12.1条
| **** | **Provisional sum adjustment (materials, engineering equipment)**: For provisional sum items that must be tendered by law, the contractor and the tenderee shall jointly conduct the tender to determine the supplier; the difference between the winning bid price and the provisional sum, together with the corresponding taxes and statutory fees, shall be adjusted in the contract price. |