GB 50500-2013 第2.0.10条
| | Daywork: During construction, miscellaneous items or work outside the construction drawings proposed by the employer shall be priced at the comprehensive unit rate agreed in the contract. For miscellaneous demolition, patching, and handling in hotel renovation, daywork rates are typically calculated at labor 200–300 RMB/workday, and machinery at the shift rate plus a 10% markup. |