GB 50500-2013 第9.5.1条
| **** | **Adjustment for inconsistent item descriptions**: Where the item description in the bill of quantities provided by the employer is inconsistent with the drawings or with the actual construction, the comprehensive unit rate shall be re-determined based on the actual construction item description in accordance with the contract, and the contract price shall be adjusted. |