ME HotelM&E AI
Home › Standards › GB 50500-2013 › 第1.1条

GB 50500-2013 第1.1条 Code of Bills of Quantities and Valuation for Construction Works

Engineering quantity measurement成本造价

GB 50500-2013 第1.1条

| **Appendix D.** | **Ventilation and Air Conditioning Works (Guest Rooms/Restaurants)**: **Ductwork** shall be measured by the developed area as shown on the design drawings (areas occupied by inspection holes, test holes, supply air outlets, return air inlets, etc. shall not be deducted). **Duct length** shall be based on the centerline length shown on the design drawings (main ducts and branch ducts shall be divided at their centerline intersections). **Equipment** (such as fan coil units and air handling units) shall be measured by quantity as shown on the design drawings in "units". |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.