GB 50500-2013 第7.2.3条
| **** | **Adjustment of measure item costs**: If measure items change due to omissions in the BOQ of divisional and sub-divisional works or causes not attributable to the contractor, those already included in the original measure costs shall be adjusted per the original scheme; where not included, the contractor shall propose and adjustment shall be made after confirmation by the employer. Measure costs such as **scaffolding, finished product protection, and temporary water and electricity** during the hotel decoration stage shall be clarified. |