GB 50500-2013 第6.2.2条 Code of Bills of Quantities and Valuation for Construction Works

Bid price成本造价

GB 50500-2013 第6.2.2条

| **** | **Pricing of preliminaries/measured items**: The pricing of preliminaries shall be independently quoted based on the list of preliminaries in the tender documents and the bidder's construction organisation design. Common preliminaries for hotel projects include:<br>• **Health, safety and environmental (HSE) costs**: Must be calculated in accordance with the regulations of the national or provincial construction authorities (typically 2%–5% of the cost of divisional and sub-divisional works) and shall not be treated as a competitive fee.<br>• **Scaffolding costs**: Tall and large spaces such as the lobby and banquet hall require separate calculation.<br>• **Finished product protection costs**: During the hotel's fine decoration stage, the cost of protecting completed areas such as guest rooms, corridors and lift lobbies requires particular attention. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.