GB 50500-2013 第5.3.2条 Code of Bills of Quantities and Valuation for Construction Works

Tender control price成本造价

GB 50500-2013 第5.3.2条

| **** | The tender control price shall be prepared by the tenderee with the capability to prepare it, or by an engineering cost consultant entrusted by the tenderee (the consultant must hold the corresponding qualification; for example, a Grade A qualification permits undertaking large hotel-type projects). |