GB 50500-2013 第5.3.1条
| **** | The error rate of the tender control price should be controlled within ±3% (i.e., if the deviation between the final settlement price and the tender control price exceeds 3%, the basis of preparation must be re-reviewed). For hotel projects, due to significant differences in the grade of decorative materials, it is recommended to conduct market price inquiries to verify major materials (such as marble and carpet). |