ME HotelM&E AI
Home › Standards › GB 50500-2013 › 第5.2.6条

GB 50500-2013 第5.2.6条 Code of Bills of Quantities and Valuation for Construction Works

Tender control price成本造价

GB 50500-2013 第5.2.6条

| **** | The tender control price shall be prepared based on the following references:<br>• Pricing quotas issued by national or provincial construction authorities (e.g., the "Consumption Quota for Building Construction and Decoration Works").<br>• Hotel design drawings, tender documents and bill of quantities.<br>• Standards and codes related to the hotel project (e.g., "Code for Design of Hotel Buildings" JGJ 62). |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.