GB 50500-2013 第5.2.3条
| **** | The safety and civilized construction fee within the measure project costs (hotel projects typically include temporary fire protection, working-at-height protection, etc.) shall be priced in accordance with the standards stipulated by the national or provincial construction authorities and shall not be treated as a competitive fee (e.g., calculated at 2.0%~3.5% of the divisional and sub-divisional works cost, subject to local documents). |