GB 50500-2013 第4.5.1条
| **** | **The preparer of the bill of quantities must be a cost engineering professional with the appropriate qualifications.** Because hotel projects involve the intersection of multiple disciplines (such as structure, finishes, and MEP), the preparer must hold a Class 1 Registered Cost Engineer qualification and be familiar with hotel operational requirements. |