ME HotelM&E AI
Home › Standards › GB 50500-2013 › 第2.0.24条

GB 50500-2013 第2.0.24条 Code of Bills of Quantities and Valuation for Construction Works

Terminology成本造价

GB 50500-2013 第2.0.24条

| | Tender control price: The maximum price limit for the tendered works, prepared by the tenderer in accordance with the relevant pricing bases and methods issued by national, provincial, or industry construction authorities, as well as the proposed tender documents and bill of quantities. For hotel projects, the tender control price shall not be raised or lowered, and shall be published at the time of tendering; it must be adjusted if the deviation exceeds ±3%. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.