GB 50300-2013 第3.0.10条
| | Construction project construction quality acceptance shall follow these procedures: 1) Inspection lots and sub-item works shall be accepted under the organization of the supervision engineer (or the project technical director of the construction unit), with the participation of the project professional quality (technical) directors of the contractor; 2) Division works shall be accepted under the organization of the chief supervision engineer (or the project director of the construction unit), with the participation of the contractor's project director and project technical and quality directors; the project directors of the survey and design units for the foundation and substructure and the main structure division works shall also participate; 3) After completion of a unit work, the contractor shall organize relevant personnel to carry out inspection and assessment on its own and submit a project acceptance report to the construction unit; 4) After receiving the project acceptance report, the construction unit shall organize the project directors of the contractor (including subcontractors), design unit, supervision unit and other units to conduct acceptance of the unit (sub-unit) work under the organization of the construction unit (project) director; 5) Where a unit work is constructed by subcontractors, the subcontractor shall inspect and assess the contracted project in accordance with the procedures specified in this standard, and the general contractor shall assign personnel to participate. After completion of the subcontracted works, the relevant documents shall be handed over to the general contractor. |