GB 50300-2013 第6.0.6条
| | Unit project quality acceptance qualification criteria: all sub-division projects qualified (100%); quality control documents complete; spot check results of main functional items meet requirements (e.g., water flow capacity of the hotel water supply and drainage system, cooling/heating performance of the air conditioning system); visual quality acceptance rated "good" or "fair" ("poor" not allowed). |