GB 50300-2013 第6.0.3条
| | Acceptance criteria for a qualified inspection lot: all main control items are qualified (100% meet the requirements); the qualification rate of general items is ≥80% (where there are allowable deviations, the deviation value shall not exceed 1.5 times the limit specified in the code). |