GB 50300-2013 第2.0.9条 Unified Standard for Constructional Quality Acceptance of Building Engineering

Terminology机电综合

GB 50300-2013 第2.0.9条

| | **Rework**: Measures such as remanufacturing or reconstruction taken for non-conforming works. In hotels, for example: the verticality deviation of guest room partition wall masonry exceeds the allowable value (allowable deviation ≤5mm/3m), requiring demolition and re-masonry; unqualified welding of fire protection piping (requiring cutting out, re-welding and non-destructive testing). |