GB 50261-2017 第9.0.12条
| **** | The following inspections shall be carried out on the system annually:<br>1. Water source supply capacity test;<br>2. Pump adapter water flow and pressurization test;<br>3. Inspection of structural materials of water storage equipment;<br>4. Inspection of filter slag discharge and integrity status;<br>5. System linkage test. |