ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第1.0.5条

GB 50261-2017 第1.0.5条 Code for construction and acceptance of sprinkler systems

General Provisions消防工程

GB 50261-2017 第1.0.5条

| | System installation shall be carried out in accordance with the approved design documents and construction technical standards. Hotel fit-out is complex; unauthorized changes to the design are strictly prohibited, especially key parameters such as sprinkler layout and pipe routing. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.