ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第1.0.7条

GB 50261-2017 第1.0.7条 Code for construction and acceptance of sprinkler systems

General Provisions消防工程

GB 50261-2017 第1.0.7条

| | Before system construction, construction drawings, technical data, construction plans and necessary construction conditions shall be available. Before hotel construction, the drawing joint review must be completed, and special construction plans shall be prepared (for different areas such as guest rooms, lobbies, kitchens, etc.). |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.