ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第9.0.7条

GB 50261-2017 第9.0.7条 Code for construction and acceptance of sprinkler systems

Maintenance management消防工程

GB 50261-2017 第9.0.7条

| **** | All control valves in the system shall be secured in the open or specified position with lead seals or chains. The lead seals and chains shall be inspected once a month and repaired or replaced promptly if damaged or broken. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.