GB 50261-2017 第8.0.5条
| | During acceptance, check whether the alarm valve assembly, water flow indicator, signal valve, end water test device and other components are installed in the correct position and orientation and function properly. |
| | During acceptance, check whether the alarm valve assembly, water flow indicator, signal valve, end water test device and other components are installed in the correct position and orientation and function properly. |