GB 50261-2017 第6.2.4条
| **** | Drain water at the end-of-line test valve; the system should start the fire pump within the specified time (within 1 min) and feed back the water flow indicator and pressure switch signals. |
| **** | Drain water at the end-of-line test valve; the system should start the fire pump within the specified time (within 1 min) and feed back the water flow indicator and pressure switch signals. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.