GB 50261-2017 第6.1.1条
| **** | System commissioning shall be carried out after system construction is completed, and the fire water pool and fire water tank shall have stored the water volume required by the design. |
| **** | System commissioning shall be carried out after system construction is completed, and the fire water pool and fire water tank shall have stored the water volume required by the design. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.