ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第5.6.3条

GB 50261-2017 第5.6.3条 Code for construction and acceptance of sprinkler systems

Construction消防工程

GB 50261-2017 第5.6.3条

| **** | The test point for the hydrostatic strength test shall be located at the lowest point of the system piping network. When filling the piping network with water, the air inside the piping network shall be completely vented, and the pressure shall be increased slowly. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.