GB 50261-2017 第5.6.2条 Code for construction and acceptance of sprinkler systems

Construction消防工程

GB 50261-2017 第5.6.2条

| **** | Strength tests and tightness tests should be conducted with water. After the system pressure test is completed, all temporary blind plates and test piping should be removed promptly and verified against the records. |