ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第5.4.1条

GB 50261-2017 第5.4.1条 Code for construction and acceptance of sprinkler systems

Construction消防工程

GB 50261-2017 第5.4.1条

| **** | Before installing the pipe network, the pipes shall be straightened and debris inside the pipes shall be removed; during installation, debris inside the installed pipes shall be removed at all times. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.