ME HotelM&E AI
Home › Standards › GB 50261-2017 › 第5.2.9条

GB 50261-2017 第5.2.9条 Code for construction and acceptance of sprinkler systems

Construction消防工程

GB 50261-2017 第5.2.9条

| **** | Before installation, check that the sprinkler model, specifications, nominal activation temperature, response time index (RTI), and glass bulb color are consistent with the design drawings (the hotel kitchen area must use sprinklers rated at 93℃ or higher). |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.