A five-star hotel in Sanya with 300 guest rooms, including 1 presidential suite, and a banquet hall of 800 m² with a height of 7 m. There are 5 meeting rooms of 60 m² each, and an ADD restaurant with 100 seats. The lobby on the first floor is 2,000 m², with the reception desk located on the first floor. The lobby bar is also located on the first floor.

Expert Q&APaul Qiao · MEP DirectorUpdated 2026-10-12
P
Paul Qiao
MEP Director

A five-star hotel in Sanya with 300 guest rooms, including 1 presidential suite, and a banquet hall of 800 m² with a height of 7 m. There are 5 meeting rooms of 60 m² each, and an ADD restaurant with 100 seats. The lobby on the first floor is 2,000 m², with the reception desk located on the first floor. The lobby bar is also located on the first floor.

You have provided very complete project information. From the perspective of an MEP director, I will systematically review the key control points across all disciplines for your Sanya five-star hotel (300 guestrooms, including 1 presidential suite, an 800㎡/7m ballroom, 5 meeting rooms of 60㎡ each, a 100-seat ADD restaurant, and a 2000㎡ lobby and lobby bar). Sanya is in a hot summer and warm winter zone with high humidity, high salt spray, and strong typhoons; these climatic characteristics run through all disciplines, and I will highlight them below.

---

I. First, clarify several qualitative judgments that affect the overall project

1. Building classification: A five-star hotel with 300 guestrooms and an 800㎡ ballroom can basically be determined to be a Class I high-rise public building (height most likely >50m), and fire protection shall comply with the strictest requirements of GB 50016-2014 (2018 edition).
2. The ballroom is the largest MEP challenge in this project: 800㎡ with a clear height of 7m, it is a large space involving smoke exhaust, air distribution, lighting, acoustics, fire water monitors, and other multidisciplinary interfaces, and performance-based or special justification must be carried out.
3. Sanya climate: air conditioning provides cooling year-round with no heating, but dehumidification is the core issue; outdoor equipment, piping, and cable trays must be designed for C5-M corrosion protection (high salt spray).
4. Presidential suite: independent fresh air, independent hot water, independent power distribution, and independent control, designed to a "hotel-within-a-hotel" standard.

---

II. HVAC discipline (the top priority of this project)

1. Cooling source scheme


2. Dehumidification (core issue in Sanya)


3. Ballroom air distribution


---

III. Electrical discipline

1. Load classification


2. Illuminance standards (according to GB 50034-2013 and JGJ 62-2014)


| Area | Illuminance (lx) | Color temperature | Remarks |
|---|---|---|---|
| Lobby general area | 300 | 3000-4000K | Uniformity ≥0.6, UGR≤22 |
| Front desk | 500-750 | 3000K | Accent lighting |
| Lobby bar | 200-300 | 2700-3000K | Ambience dimming |
| Guestroom general | 100-150 | 2700-3000K | CRI≥95 |
| Bedside reading | 300 | 2700K | Local |
| ADD restaurant | 200-300 | 2700-3000K | Dimmable |
| Ballroom general | 300-500 | 3000-4000K | Dimmable, 500-750 in meeting mode |
| Meeting room | 300-500 | 4000K | UGR≤19 |

3. Power distribution and lightning protection/earthing


---

IV. Plumbing and drainage discipline

1. Domestic hot water (key point in Sanya)


2. Drainage


3. Swimming pool/SPA (if any)


---

V. Fire protection discipline (key to acceptance success)

1. Ballroom (the biggest challenge)


2. Evacuation


3. Fire Acceptance (Sanya Local Requirements)


---

VI. Extra-Low Voltage & Intelligent Systems

---

VII. Elevator Discipline

Per JGJ 62-2014 and industry experience:

---

VIII. Fit-Out Coordination (MEP & Decoration Interface)

---

IX. Summary of Sanya Special Requirements

| Item | Requirement |
|---|---|
| Corrosion protection | Outdoor equipment, cable trays, piping to C5-M grade |
| Typhoon protection | Cooling towers, rooftop equipment, signage reinforced |
| Lightning protection | Class II and above, graded SPD |
| Dehumidification | Deep dehumidification of fresh air, dew point ≤12℃ |
| Hot water | Condensate heat recovery, energy-efficient |
| Fire protection | Hainan Province Implementation Rules apply |

---

X. Decision Recommendations

1. Launch BIM MEP coordination immediately, especially banquet hall, lobby, plant rooms — key to cost control and schedule.
2. Performance-based fire design for banquet hall; engage Sanya fire authority early to avoid acceptance risk.
3. Finalize cooling source + heat recovery scheme early — affects plant room area, electrical capacity, investment.
4. Conduct elevator traffic analysis; for 300 guest rooms recommend 4 passenger + 2 service, dedicated for presidential suite.
5. Fire design special section + third-party review, referencing Guangzhou G Hotel's first-pass experience.

If needed, I can provide detailed schemes for banquet hall MEP special, cooling source comparison, performance-based fire design, or elevator traffic calculation. Please first tell me the project's building height, number of floors, whether there is a pool/SPA, and whether the kitchen uses gas, and I will refine further.

Standard reference

GB 50016-2014GB 50189-2015GB 50736-2012GB 50016GB 50052-2009GB 50034-2013

More from this expert

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.