22 floors, height 99 m, own five-star hotel brand. Chiller units are located on Basement Level 2, and the boiler room is on Basement Level 1. Domestic hot water is located on Basement Level 2, and the cooling towers are located on the Level 3 roof of the podium.

Expert Q&APaul Qiao · MEP DirectorUpdated 2026-10-12
P
Paul Qiao
MEP Director

22 floors, height 99 m, own five-star hotel brand. Chiller units are located on Basement Level 2, and the boiler room is on Basement Level 1. Domestic hot water is located on Basement Level 2, and the cooling towers are located on the Level 3 roof of the podium.

Let me first lay out the fundamentals of your project: 22 storeys, 99 m, own five-star brand, cooling source on B2, boiler room on B1, domestic hot water on B2, cooling towers on the podium 3rd-floor roof. This vertical arrangement has no fundamental flaws in principle, but several key compliance points and systemic issues must be locked down first; otherwise, the later construction drawing review and fire acceptance will definitely get stuck. I will break this down for you discipline by discipline.

---

I. First define the building classification and fire characterization (this determines all subsequent disciplines)

At 99 m and 22 storeys, per GB 50016-2014 (2018 edition) Clause 5.1.1, it is a Class I high-rise public building. A five-star hotel is itself a densely occupied place. This characterization directly leads to three hard constraints:

1. Boiler room location: You have placed it on B1, and the direction is correct. GB 50041-2020 Clauses 4.1.3 and 4.1.5 clearly state: oil-fired and gas-fired boiler rooms shall be located on the ground floor or on B1 adjacent to an exterior wall, and are strictly prohibited from being located on the floor above, the floor below, or immediately adjacent to a densely occupied place. B1 is acceptable, but the following must be met:

2. Chiller plant: On B2, this is conventional practice. But note GB 50016's requirements for evacuation from underground rooms—the chiller plant is large in area with few on-duty personnel, so at least one evacuation exit must lead directly outdoors or to a safety exit, and the distance from the farthest point in the plant to the evacuation door must meet the code.

3. Domestic hot water on B2: Here the heat source form must be distinguished. If it is a volumetric heat exchanger + boiler high-temperature water, it is essentially a heat exchange station, and B2 is feasible; if it is a gas-fired hot water boiler, then it must return to GB 50041-2020 Clause 4.1.3, and cannot be located on B2 (unless atmospheric negative-pressure and all safety conditions are met). You must confirm the heat source form with the design institute—many projects fail here.

---

II. Vertical zoning (99 m is the watershed)

99 m means the water supply system must be vertically zoned. Per GB 50015-2019 Clause 3.4.5, the static pressure at the most unfavorable point of each zone shall not exceed 0.45 MPa, and the service pipe should preferably not exceed 0.35 MPa.

---

III. Cooling towers on the podium 3rd-floor roof—this is the point requiring the most attention in this project

Placing cooling towers on the podium 3rd-floor roof is technically feasible, but the following conditions must be met simultaneously:

1. Ventilation and thermal recirculation: Cooling towers should be located in well-ventilated areas, avoiding recesses or hot air recirculation zones. The spacing between adjacent towers and the distance from exterior walls shall be not less than 2 m; otherwise, inlet air short-circuits and cooling efficiency is directly compromised.

2. Noise: This is the most sensitive indicator for a five-star hotel. Per GB 22337, cooling tower noise shall be ≤55 dB(A) during the day and ≤45 dB(A) at night. The podium 3rd-floor roof is often adjacent to guest room floors or sky gardens, so the following are mandatory:

3. Structural load and waterproofing: The operating weight of a cooling tower (including water) is often several tonnes, so the roof structure requires special verification; tower bases shall be concrete foundations + waterproofing upturns to prevent long-term vibration from causing roof leakage.

4. Drift and water quality: Five-star hotels have high requirements for cooling tower drift rate; select closed-circuit towers or low-drift open towers, and consider chemical dosing and side-stream filtration to prevent Legionella—this is a hard indicator for hotel hygiene licensing.

5. Elevation difference from chillers: Chillers are on B2 and cooling towers on the 3rd-floor roof, an elevation difference of more than about 20 m. The cooling water pump head, air venting of the cooling water piping, and drain-down/siphoning issues at shutdown must all be calculated clearly. It is recommended to provide a high-level expansion tank or pressure-stabilized make-up for the cooling water system, and automatic air vents at the highest points of the piping.

---

IV. Interface issues in vertical coordination among disciplines

With your arrangement, three interfaces among MEP disciplines must be locked down through coordination meetings:

| Interface | Conflict point | Handling principle |
|---|---|---|
| Boiler room (B1) ↔ Domestic hot water (B2) | High-temperature water piping vertical penetration | Centralized pipe shafts, insulation + compensators in place in one go |
| Chiller plant (B2) ↔ Cooling towers (3F roof) | Cooling water pipe elevation difference, venting, water hammer | Provide intermediate heat exchange or pressure stabilization, venting at highest points |
| Domestic hot water (B2) ↔ Guest rooms (4–22F) | Hot water riser heat loss, circulation balance | Reverse-return supply, zone circulation pumps, return water temperature ≥50℃ |

---

V. Decision recommendations for you (three at the director level)

1. Lock down the heat source form first: Whether domestic hot water uses heat exchangers or gas-fired boilers directly determines whether the B2 arrangement is compliant. Until this is fixed, everything else is empty talk.

2. Conduct a dedicated study for the cooling tower location: Address noise, thermal recirculation, structural load, and drift together, and issue a simulation report at the scheme stage—do not leave it to the construction drawings.

3. Lay out vertical zoning and pipe shafts in one go: For a 99 m building, pipe shafts, equipment floors, and refuge floors must be determined in sync with architecture and structure; changing shafts later in the MEP stage is extremely costly.

If you can provide the heat source form, the distance from the podium 3rd-floor roof to the nearest guest room, and whether a refuge floor is provided, I can help you refine the cooling tower selection and vertical zoning scheme one level further.

Standard reference

GB 50016-2014GB 50041-2020GB 50016GB 50015-2019GB 50015GB 22337

More from this expert

Still have a specific question? Ask a MEP expert