Expert Q&APaul Qiao · MEP DirectorUpdated 2026-07-13
P
Paul Qiao
MEP Director

2500KVA, not 25000KVA

The key point you raised—"2500kVA, not 25000kVA"—is very important, as it directly affects the choice of high-voltage power supply scheme, transformer configuration, and the economics of the entire electrical system. As MEP Director, I must emphasize that in the early stage of a project, accurate load estimation is the foundation of all decisions.

Regarding the capacity value you proposed, based on codes and experience, I offer the following analysis:

I. Capacity characterization: 2500kVA falls under the typical "mid-sized hotel" category

Based on my past project experience, a total installed capacity of 2500kVA typically corresponds to hotels of the following scale:

This capacity is fundamentally different from the 25000kVA you mentioned (which typically corresponds to a super-large hotel complex or a project with large-scale commercial and convention/exhibition functions). Once this order of magnitude is confirmed, the choice of high-voltage power supply scheme becomes very clear.

II. Choice of high-voltage power supply scheme: 10kV is the optimal solution

Based on Article 3.0.2 of GB 50052-2009 Code for Design of Power Supply and Distribution Systems, when the capacity of electrical equipment exceeds 250kW or the supply distance exceeds 250m, a voltage level of 10kV or above should be adopted. Your 2500kVA capacity is far greater than 250kW, so high-voltage supply is inevitable.

Conclusion: 10kV supply is the most economical and conventional choice for a 2500kVA load.

Why not 35kV?
1. Capacity threshold: A 35kV supply scheme is typically recommended for large projects of 10MVA (10000kVA) and above. For a capacity of 2500kVA, adopting 35kV would greatly increase initial investment (a 35/0.4kV substation would be required; 35kV equipment is expensive, occupies a large area, and is complex to maintain), and is entirely unnecessary.
2. Economics: According to the "transformer capacity optimization" logic mentioned in 【FAQ-Cost】, a 35kV supply scheme would cause a serious mismatch between the transformer capacity (e.g., 2500kVA) and the high-voltage side voltage level—a typical case of "a small horse pulling a big cart," with extremely poor economics.

III. Transformer configuration and load rate optimization scheme

Now that 10kV supply is confirmed, the next step is the specific transformer configuration. This needs to be optimized in conjunction with GB 50053-2013 and GB/T 13462-2008.

Recommended scheme: adopt 2 × 1250kVA dry-type transformers, mutually backup.

Cost advantages compared with a single 2500kVA scheme (refer to 【FAQ-Cost】):

IV. Final decision recommendations

As MEP Director, I recommend that you:

1. Immediately review the load calculation report: confirm whether 2500kVA is the final confirmed total installed transformer capacity rather than a preliminary estimate. Verify whether it includes the capacity of the diesel generator. Hotels typically also require an emergency diesel generator of approximately 800–1000kW, and this capacity is not included in the total transformer capacity.
2. Insist on the 10kV supply scheme: for a 2500kVA load, unless the local power supply bureau has special requirements (e.g., certain industrial parks mandatorily require 35kV connection), 10kV supply should be firmly chosen. This is the most mature, most economical, and most convenient scheme for operation and maintenance.
3. Refine the transformer configuration: communicate with the electrical design institute to further develop "2x1250kVA" as the preferred scheme. This satisfies the power supply requirements of GB 50052 for Grade I loads and also complies with the energy-saving principle of economic operation.

In summary, the capacity correction you proposed is crucial. Based on the accurate value of 2500kVA, we can fully develop a technically reliable and economically reasonable electrical system scheme. Please be sure to use the final confirmed load calculation report as the basis, as it is the foundation for all subsequent work. If you have a more detailed load list, we can further discuss the specific distribution cabinet configuration and diesel generator selection.

Standard reference

GB 50052-2009GB 50053-2013GB/T 13462-2008GB 50052

More from this expert

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.