ME HotelM&E AI
Home › Standards › GB 50116-2013 › 第10.1.5条

GB 50116-2013 第10.1.5条 Code for design of automatic fire alarm systems

System power supply消防工程

GB 50116-2013 第10.1.5条

| The transfer time of the fire protection equipment emergency power supply (EPS) shall meet the requirements of the equipment's permitted power supply interruption; for fire alarm control units, the transfer time shall not exceed 5 seconds.

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.