GB 50116-2013 第6.1.2条
| System grounding: A dedicated grounding main shall be used, and the grounding resistance shall not exceed 4Ω.
| System grounding: A dedicated grounding main shall be used, and the grounding resistance shall not exceed 4Ω.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.