GB 50116-2013 第4.4.1条
| Smoke control system interlock: after fire confirmation, the smoke exhaust outlets and air supply outlets in the corresponding smoke control zones should be opened by interlock.
| Smoke control system interlock: after fire confirmation, the smoke exhaust outlets and air supply outlets in the corresponding smoke control zones should be opened by interlock.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.