GB/T 50328-2014 第5.1.8条 Code for Archiving Construction Project Documents

Archive Quality机电综合

GB/T 50328-2014 第5.1.8条

| **** | All as-built drawings shall bear an as-built drawing stamp. The as-built drawing stamp shall include the words "As-Built Drawing", the construction unit, preparer, reviewer, technical director, preparation date, supervision unit, on-site supervisor, chief supervisor, and other contents. In hotel buildings, if design changes involve guest room layouts or fire compartments, the as-built drawings must be redrawn and stamped. |