GB 50057-2010 第第4.2.1条条
- Class III lightning protection building: the spacing between down conductors shall not exceed **25m** ();
- Class III lightning protection building: the spacing between down conductors shall not exceed **25m** ();
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.