ME HotelM&E AI
Home › Standards › GB 50054-2011 › 第7.4.1条

GB 50054-2011 第7.4.1条 Code for Design of Low-Voltage Power Distribution

Laying of power distribution lines电气工程

GB 50054-2011 第7.4.1条

| | When distribution lines pass through floor slabs or walls, protective conduits shall be provided, and the conduit openings shall be tightly sealed. Where conduits pass through the partition walls and floor slabs between hotel guest rooms and corridors, firestop sealant must be used for sealing. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.