ME HotelM&E AI
Home › Standards › GB 50019-2015 › 第11.1.2条

GB 50019-2015 第11.1.2条 Code for Design of Heating, Ventilation and Air Conditioning of Industrial Buildings

Monitoring and Control暖通空调

GB 50019-2015 第11.1.2条

| When the system is large in scale or centralized management is required, a centralized monitoring system should be adopted. In hotel buildings, when the total cooling load of the air-conditioning system is greater than or equal to 1758 kW (approximately 500 refrigeration tons) or the total heating load is greater than or equal to 2326 kW, it is recommended to install a Building Automation System (BAS) for centralized management.

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.