ME HotelM&E AI
Home › Standards › GB 50019-2015 › 第8.1.2条

GB 50019-2015 第8.1.2条 Code for design of heating, ventilation and air conditioning of industrial buildings

Cooling and heating sources暖通空调

GB 50019-2015 第8.1.2条

| | The cooling and heating source scheme shall be determined through technical and economic comparison based on factors such as building scale, usage characteristics, load characteristics, energy conditions, environmental protection requirements, and operation management. Hotel buildings should give priority to centralized cooling and heating source systems. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.