GB 50019-2015 第9.2.1条
| **** | The cooling and heating sources of the air-conditioning system should be comprehensively determined based on building scale, usage characteristics, energy conditions and environmental protection requirements. Hotel buildings should give priority to **centralized cooling and heating sources** (such as chillers + boilers or heat pumps), and part-load operating efficiency should be considered. |