ME HotelM&E AI
Home › Standards › GB 50019-2015 › 第5.5.2条

GB 50019-2015 第5.5.2条 Code for Design of Heating, Ventilation and Air Conditioning of Industrial Buildings

Heating暖通空调

GB 50019-2015 第5.5.2条

| | The heating system should be equipped with air venting devices. In hotel buildings, automatic air vents should be installed at high points of the system, and drain valves at low points, to facilitate maintenance and prevent air locks. |

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.