ME HotelM&E AI
Home › Standards › GB 50015-2019 › 第4.2.6条

GB 50015-2019 第4.2.6条 Standard for Design of Building Water Supply and Drainage

Water feature给排水

GB 50015-2019 第4.2.6条

| Water feature projects should be equipped with an electrical control system to achieve functions such as scheduled start/stop, water level control, and pump protection. The control box should be located in a dry, well-ventilated area, with waterproof and moisture-proof measures implemented.

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.