GB 50015-2019 第6.2.4条
| The suction pipe flow velocity of the circulating water pump for the cooling tower should be 1.0 m/s–1.5 m/s, and the flow velocity of the main outlet pipe should be 1.5 m/s–2.0 m/s.
| The suction pipe flow velocity of the circulating water pump for the cooling tower should be 1.0 m/s–1.5 m/s, and the flow velocity of the main outlet pipe should be 1.5 m/s–2.0 m/s.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.