GB 50015-2019 第6.2.2条
| The effective volume of the cooling tower basin shall be calculated as 1.2 to 1.5 times the circulating water flow rate of the cooling tower, and shall not be less than 5 m³.
| The effective volume of the cooling tower basin shall be calculated as 1.2 to 1.5 times the circulating water flow rate of the cooling tower, and shall not be less than 5 m³.