ME HotelM&E AI
Home › Standards › GB 50015-2019 › 第5.2.4条

GB 50015-2019 第5.2.4条 Standard for Design of Building Water Supply and Drainage

Rainwater给排水

GB 50015-2019 第5.2.4条

| For roof rainwater drainage systems in high-rise buildings (including hotels), the connection of roof drains to suspended pipes and vertical stacks shall use 45° lateral tees or sweep tees, and the connection of the vertical stack bottom to the discharge pipe shall use two 45° elbows or long-radius elbows.

Other clauses of this standard

Still have a specific question? Ask a MEP expert

12 hotel MEP experts online, answers cite standard clauses you can verify.

Ask free →

Engineering reference only — verify against project conditions and the latest codes.