GB 50014 第2.0.2条
Design return period: the storm return period adopted in the design of the drainage system.
Design return period: the storm return period adopted in the design of the drainage system.
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.