GB 51309-2018 第6.0.14条
| **** | During system acceptance, check whether the as-built drawings, design change documents, product certificates, type test reports, commissioning records and other documents are complete. |
| **** | During system acceptance, check whether the as-built drawings, design change documents, product certificates, type test reports, commissioning records and other documents are complete. |