GB 50015-2019 第4.6.2条
| **** | In hotel buildings, a support pier or fixing measure shall be provided at the connection (bend) between the bottom of the domestic drainage stack and the discharge pipe. When the stack height exceeds 50 m, a dedicated pressure-relief device shall be installed at the bottom, or a reinforced bend shall be used. |