GB 50015-2019 第3.9.2条 Standard for Design of Building Water Supply and Drainage

Water feature给排水

GB 50015-2019 第3.9.2条

| Water feature projects should be equipped with a circulating water treatment system, and the circulating water should be disinfected; circulating water pumps should preferably use variable-frequency speed control, and the circulating flow rate should be calculated according to the circulation cycle of the water feature volume, with the circulation cycle preferably being 4 h to 8 h.