GB 50348-2018 第7.3.1条 Technical Standards for Security Protection Engineering

Inspection and Acceptance弱电智能化

GB 50348-2018 第7.3.1条

| **** | Project acceptance shall be divided into three stages: concealed works acceptance, sub-item works acceptance, and completion acceptance. Concealed works (such as pipeline laying) acceptance shall be completed before concealment. |