GB 50348-2018 第6.5.2条
| **** | Before concealed works are concealed, the contractor shall notify the supervision unit (or the client) to conduct acceptance inspection, and acceptance documents shall be produced. |
| **** | Before concealed works are concealed, the contractor shall notify the supervision unit (or the client) to conduct acceptance inspection, and acceptance documents shall be produced. |
12 hotel MEP experts online, answers cite standard clauses you can verify.
Ask free →Engineering reference only — verify against project conditions and the latest codes.